week 2

this week i awaited the arrival of materials mostly

using the multimeter and pool sample water, it was determined that my current design will not short

I have selected a fabric, but have not yet ordered it

kevin directed me to think about programming even if i didn’t have my accelerometer, and so i problem-solved the coding a little bit

main problem is not having the materials yet and the main success was finding out that water doesn’t conduct the way originally thought over a distance so that was a step in the right direction.

i am behind

next week i plan to start using my accelerometer to collect data that i can really hash out the coding with