DS699 – Week of 11-07-2015

Installation of glass window mapping design is done. In the past weeks, it’s production, production, production…….

The large scale transparent prints arrived. More fine measurement, final cutting, clean glass windows, and finally putting the prints up.

All_SideViewR_1229 Far_Front__1187 Far_SideR1212 Lower_Front_Goodtake1_1188 Upper_Front_ppl_1197 Upper_Inside_SunlxL_1166 Upper_Inside_SunlxR_1170