week 2

this week i awaited the arrival of materials mostly

using the multimeter and pool sample water, it was determined that my current design will not short

I have selected a fabric, but have not yet ordered it

kevin directed me to think about programming even if i didn’t have my accelerometer, and so i problem-solved the coding a little bit

main problem is not having the materials yet and the main success was finding out that water doesn’t conduct the way originally thought over a distance so that was a step in the right direction.

i am behind

next week i plan to start using my accelerometer to collect data that i can really hash out the coding with

Week 2 – progress report

  • What did you do this week? [Include image(s)]
  1. Got all the material
  2. tested the screen
  3. tested the android toolkit and paired it up with arduino BT.
  4. tested the QTC material (res: 25 ohm – 1.5K ohm)
  • Describe the problems you encountered
  1. still we have a little problem for sending command from android to arduino
  • Describe the successes you had
  1. Android toolkit installed successfully
  2. Screen
  • Are you on schedule?
  1. sort of, we kind of jump to the second milestone 
  • What do you plan to do next week?
  1. will embed the QTC inside the PDMS
  2. working/coding for both android and arduino part
  3. starting to embed the LEDs inside the gloves

 

 

 

Week 2

talked to Kevin about how to hook up my EL wire to the Arduino to allow for multiple strands of EL wire to be hooked up.

played around with style lines on the dress form to see how far three meters would get me.  What you see is three meters, so I will need at lease 6 more meters to get the look I was going for.

this is what the style lines look like under fabric.  I’m just playing around with different look.

where all the hardware will be hidden.

Successes:

got the EL wire to light up and played around with a couple of style lines

Problems:

Realizing that there will be more bulk than I was hoping for in the back of the dress but hopefully that will be covered by the fullness in the train.

Schedule:

I am behind schedule, but hopefully I can pick things up in this coming week.

 

 

moving forward:

-keep patterning

-figure out how much EL wire I will need.

-Figure out how I will make the lights flash to the beat of music using a sound sensor.

 

Project Update Posting Structure

For the weekly update posts, please address the following questions:

  • What did you do this week? [Include image(s)]
  • Describe the problems you encountered
  • Describe the successes you had
  • Are you on schedule?
  • What do you plan to do next week?

Week 1 progress

This week was a struggle but I got some stuff done.

I have ordered my accelerometer and colored LEDs

i have extensively narrowed fabric choices down from swatches i have

Nathan and Kevin have helped me make my project more ambitious with the use of 4 or 6 magnet terminals as a way to effectively “waterproof” my unit, but allow it to communicate and charge with the outside world.

Most importantly, today I had a nice swim for research and collected a sample of genuine SERF pool water.

Goal for this next week is to post the weekly update on time.

-Zach

EL Dress

Description:

Fitted structured dress with a long train.  EL wire is used to outline the silhouette and emphasizing two different style lines as well as illuminate inserts from underneath.  There will be two different style lines that will be illuminated at different times.  This dress is meant to be seen in a fashion show or installation atmosphere

Inspiration:

Fast and Furious cars are my main inspiration.  The sleek lines of the car are mimicked in the outlining of the style lines and the silhouette.  Fast and Furious cars are illuminated from underneath, which will be mimicked in the inserts.

Plan:

-Pattern
-Sew dress
-Couch EL wire onto dress on both inside and outside. (there will be a lining)
-Power it through battery pack under train in back of the dress
-Program EL wire with the arduino to turn different style lines on and off.
      –There will be two different sets of style lines
Back up Plan:
        If all else fails, I will only illuminate one set of style lines.
Calendar:
-Week one
      -Patterning
      -Play with el wire and figure out how much I will need
-Week two
       -Start sewing and ordering el wire
-Week three
       -Continue sewing and start couching on el wire
-Week four
       -Finish couching on el wire  and start programing
-Week five-eight
       -Finish programing and start making sure everything is working
       -Make sure that lights stay on for a long time

Moneo: Day 4

Gallery

This gallery contains 5 photos.

Did a lot of reading about connecting SD flash card to an Arduino Got the first box of parts from SparkFun See all the unpacking photos below: